Monday 8-11-Chris Audra Jasmine.
11-12-Audra Rachel Kara Jasmine.
12-1 Audra Jasmine Rachel Kara David.
1-3 Audra Rachel David Kara
3-5 Danielle Mike
5-7 Danielle Joanna Meredith Aiesha Mike Sean
7-9 Chris Audra Mike
9-11 Chris Audra Mike
11-1 Meredith Sean
Tuesday 8-11 Joanna Julia Jasmine
11-12 Julia Ethan Danielle Kyle W. Jasmine Mike Joanna
12-1 Ethan Danielle Kyle W. Aiesha Mike
1-3 Ethan Danielle Kyle W. Mike Aiesha
3-5 Meredith Aiesha Ashlee Kara Sean
5-7 Meredith Kyle L. Ashlee Kara
7-9 Chris Kyle L. Alli David Kara
9-11 Kyle L. Alli, David, Kara, Chris
11-1am Chris, Kyle L
Wednesday 8-11 Chris Audra 11-12 Aurda Rachel
12-1 Audra Leanne Rachel
1-3 Audra Danielle Leanne Rachel Mike
3-5 Danielle Leanne Kyle L. Kara. Julia Mike
5-7 Julia Alli Joanna Aiesha Mike Kara
7-9 Chris Michelle Kyle L Kara Joanna David Julia
9-11 Chris Kyle L. David Rachel
11-1 Kyle L. Rachel
Thursday 8-11 Joanna Julia Jasmine 11-12 Ethan Danielle Mike Kyle W. Joanna
12-1 Ethan Danielle Mike Kyle W. Aiesha
1-3 Ethan Meredith Sean Ashlee Aiesha Kyle W
3-5 Ashlee Kyle L Aiesha
7-9 Chris Mike Kyle L. Alli. David
9-11Chris Mike Kyle L. Alli David
11-1am Chris Mike Kyle L.
Friday 7-10 Ashlee-beverage duty
Saturday 7-10 Ashlee-beverage duty
Sunday 8-11 Ashlee Mike Julia.
11-12 Ashlee Alli David Julia Mike
12-1 Ashlee Leanne Alli Julia David Mike
1-3 Ashlee Leanne Alli David Mike Joanna
Here is the Construction crew List for this Saturday and Sunday at 10am:
Saturday- Alli, Rachel, Kara, Ethan, Kyle W, Leanne, Michelle
Sunday- Alli, Mike, Aeisha, Sean, Jasmine, Julia, Kyle W, Ethan
Start leaving comments for Post-show deconstruction, Saturday 4th and Sunday the 5th
Saturday- Ashlee
Sunday- Ashlee
Wednesday, March 25, 2009
Subscribe to:
Post Comments (Atom)
i don't know about anyone else but that link did not work for me, sorry!
ReplyDeleteDoesn't work for me either :x
ReplyDeleteoh man, i'm sorry about that-i'm very un-tech savvy. i'm going to try and fix it, it links to a spreadsheet.
ReplyDeleteI need to change all my Wed. shifts for Tuesday. Instead of working 8-3pm an Wed, I can work 8-3pm Tuesday.
ReplyDeletecan someone give me a ride from peg landing on sunday? if not i could walk.
ReplyDeletei dont mind doing beverage duty either, having shifts.
ReplyDeleteFYI: Monday I'll be available 1-5, not 12-3
ReplyDeleteAny word on the materials? Have they been ordered? Do we know when they might be available to pick up yet?
-David
i've emailed home depot waiting for a reply and confirmation
ReplyDeleteSo the order hasnt even gone through yet? Can we call them or talk to somebody in person? This is very bad if the materials get delayed.
ReplyDeletei called and asked however our contact there had already gone home for the day. he will be back in tomorrow at 9. i will call him promptly at 9 to get everything straightened out. jasmine if you want to be there at 10:30, i will be there and i'll make sure we have everything ready to go. i'm not sure if we'll need your trailer or not. here is the list:
ReplyDeleteItem Amount
2" Painter's Tape 2
Value Pack Brushes 2
Primer 1
Wood Putty 1
Razor Blades 2
14" Mud Trays 2
1/2"x4'x8' MDF 1
4'x8' Masonite Hardboard 3
1/2" x 4' x 8' Sheetrock 20
2x4 Studs 134
Corner Bead 28
Screws (Large bucket) 1
Paint Rollers 4
Sand Paper 1
Face Masks 2
Drywall Tape 2
Drywall Mud 1
Drop Cloths 2
Wall Anchors 1
Drywall Trowels 2
134 studs is a lot but also remember we won't be picking up the drywall until monday either. this is not very bad
We're supposed to have 7 sheets of masonite/hardboard.
ReplyDeleteAlso 1 sheet of sanded pine (22.88 - the nice stuff)
I also don't see 2x3" studs, were these replaced with 2x4's?
We also need polyurethane.
So, what I noticed not on the list:
7 masonite
1 sanded pine plywood
26? 2x3" studs
1 quart polyurethane
i'll change it to 7 masonites but after talking it over with theo we're going to use MDF and paint it instead of the plywood. this saves us money on the substrate and on the polyurethane, and since we're painting the studs on the pedestals anyway, the top will go better with the bottom, and the pedestals will match the walls. we replaced the 2x3s with 2x4 because it made things simpler and they were 10 cents cheaper than the price you'd given me.
ReplyDeleteI think the list looks sufficient, although wouldn't we need more than one sand paper/block? It's minor but thought id say something.
ReplyDeleteChris
Everyone please print this Schedule out as a hard copy to have.
ReplyDeleteChris
Oh well.
ReplyDeleteit's a really general list. the sandpaper is a 25 pk. a lot of them are packs
ReplyDeleteEthan, I had told Jasmine 9am and she hasn't responded to my text I just sent alerting her to the time change. I'm going to tell her to call you or me in the morning to double check the time. I was going to meet her at 9 but I'm not sure if I can make it at 10:30 since I have class, so I guess if you can be there that will be good. I'll be on campus to help with unloading and all that.
ReplyDelete10:30, I'll be there.
ReplyDeleteWhats the word on Home Depot?
ReplyDeletewe have supplies. we unloaded them into the sculpture studio. we had to stack them in probably the worst place that we could, sooo we need to get things together in there asap so we don't wake the angry bear that is isenhour. i'll be in there at 1:30 after my class...make that 2, i want some lunch, in case anyone is available and wants to get started.
ReplyDeletei'm feeling quite ill and feverish today so im afraid im not going to be able to help out. :(
ReplyDeletei'm trying to go back to bed and fight this sickness so i can help out tomorrow, as scheduled.
sorry for the late notice, hope you can understand.
Hi everyone, I got my work schedule confused, so Monday I will not be able to be at the site constructing. Instead, I will come Thursday 11-3. Sorry about my mistake.
ReplyDeleteill be going 8-12ish today, and not from 1-5.
ReplyDelete